This is the 3rd and final week with the Earthship Biotecture crew from New Mexico and all of the wonderful apprentices.  I'm pretty sad that it will be over in a week... the camaraderie, teamwork, fun times, and the speed of our house being worked on!  I'll try to enjoy and take in every moment this week!

 

 

Groton High School's old bleachers... planed and trimmed! 
Taylor sends the bleachers through the saw

 

Then Rob planes them

 

Sand covering to level the master bedroom floor

 

lots of help packing out the stem wall/planter cell

 

 

stem wall pack-out

 

vapor barrier

 

Osmany working on the master bathroom can and bottle wall

 

bedroom can walls getting higher!

 

 

pantry footer

 

entryway to the inner-house footer

 

Francis working on putting mesh around the shower humidity vent cap

 

working on the stem wall pack out

 

 

The power organizing module (POM) in a closet in the front greenhouse

 

The water organizing module (WOM) get the pressure tank installed

 

Osmany and the can wall: "They grow so fast."

 

Plywood in master bedroom 

 

Wood floors in master bedroom!

 

 

 

 

 

looking up in the greenhouse... these tubes are plumbing vents

 

looking through the walls into each room

 

pantry footer dug

 

polishing up the front beautiful window art
Read 6119 times

 

 

 

 

 

 

Earthship Malawi, Africa.

Donate Today | Get Involved earthship.com/africa
$ 13000
donation thermometer
donation thermometer
$ 1780
donation thermometer
14%
Updated
5/17/2013

Music by Paul Josephs and MetroSonics.
metrosonicsmusic.com

Members Login

Sign in with Facebook

Top 10 Items

earthships - latest news.
Shop the Earthship Online Store (575-613-4409), visit us at the Earthship World Headquarters near Taos, NM, USA.

 

Copyright © 2012 Earthship Biotecture, LLC. All rights reserved. Terms of Use | Privacy Policy