Archives for March 2014

Earthship Philippines Windship

philippines_phils_day_3
Earthship Biotecture partnered together with the Earth Village and the people of Barrangay Batug to coordinate and build a wind proof structure to use as a prototype for rebuilding in the Philippines. This 10-day hit was the first of several phases of rebuilding the affected areas of the Philippines after Typhoon Haiyan. Read More

The Great Wall of Ushuaia

Robert Hirsch

In February of this year, following the one month Academy build of the Earthship (Nave Tierra) in Ushuaia, the municipality of Ushuaia requested that Earthship Biotecture organize a small crew to stay on and construct a giant tire retaining wall (muro de contencion) at the swimming complex at Andorra, a suburb of the city. The wall was needed to stabilize a 100 meter long embankment beside a high dirt road paralleling the sports facility. Mike planned out the base and batter (3″) for the tire work, and I (USA), Kimi Grum (Argentina) and Andressa Malaga (Brazil) had 1 week to organize the tools, tires and people. Guillermo Worman, from the municipality, was the go-to guy for all our needs. He was essential at keeping the project running on schedule. So with the 3 of us from EB and about 10 academy students, a few friends of students and 15 or so hired local workers we built The Great Wall of Ushuaia. Read More