Ithaca New York Build – Day 11

A lot is happening inside now, as the roof and berm are finished.  A few people are finishing off the entryway (plastering) and a group of people are concentrating on the back doorway, where we’re having a patio.  Inside, there is still a lot of pipes and tubes for plumbing being placed, and the can walls are rising!

   Another big highlight of today is that the solar panels went up!    

 

 

installing a bedroom door

 

Joe digging the footer for the pantry

 

oh Nick

 

getting ready to install the solar panels!

 

 

bedroom #2 can wall leading to master bathroom wall

 

water organizing module (WOM)

 

cistern overflow

 

 

half of our panels

 

Sam, Ali, Joe, and Don installing a solar panel

 

back patio area

 

Doug and Gary

 

 

 

plumbing!

 

back doorway bottle art

 

 

the two bedrooms